The construction industry is developing more and more rapidly. With the continuous improvement of people's green awareness, new energy-saving building materials are constantly joining our lives. Lightweight wallboard is one of the new energy-saving wall materials. It has the advantages of light weight, high strength, thermal insulation, sound insulation, breathing and humidity control, fire prevention, rapid construction, and reducing wall costs.

Construction conditions and scheme of light wallboard

The construction industry is developing more and more rapidly. With the continuous improvement of people's green awareness, new energy-saving building materials are constantly joining our lives. Lightweight wallboard is one of the new energy-saving wall materials. It has the advantages of light weight, high strength, thermal insulation, sound insulation, breathing and humidity control, fire prevention, rapid construction, and reducing wall costs.

Lightweight wallboard is composed of gypsum, lightweight steel slag, fly ash and other industrial waste, and is cured by variable frequency steam pressure. The inner layer is equipped with a reasonable layout of heat insulation, sound absorption of inorganic foam profiles or other thermal insulation materials. So what are the lightweight wallboard construction program? Jia Kai building materials company immediately take you to understand it.

1. construction conditions in the early stage of construction:

1. Check whether the frame meets the specifications and whether it meets the strength of the design standard.

2, the floor needs to carry out clean washing of the working face, check the density of the floor.

3, the wall did not carry out rough plastering decoration. The slabs of the slabs are not under construction, and the underside must be kept clean.

4. The drawings of the place to be constructed and the construction personnel shall make disclosure, and the construction personnel shall know the construction process.

5, for special tasks of personnel, must be carefully reviewed, to reach the technical level of the height of the construction, into the construction responsibility to the people.

2. construction arrangements:

1, in the case of quality can be guaranteed, it is necessary to establish a relatively complete management system, so as to ensure the orderly progress of the work.

2, the construction preparation work should be in place, the requirements for technical personnel should be put in place, to implement the problem of the line, install the line. The guarantee of materials, the materials entering the site should be strictly checked, the materials should be put on record after passing the standards, and the equipment should be checked carefully, which can save the functional replacement of equipment in time if there is any problem,

3, the establishment of quality control team, do, materials are not qualified for construction use, the previous process is not clear handover shall not start the next process.

Construction Scheme of 3. Light Wallboard

1. Put out the line, transport the board in place, and pop up the board thickness double lines up and down respectively on the axis of the installation of light wall panels.

2. According to the specifications of lightweight wallboard, cut with a portable chainsaw at will.

3. Place cement mortar on the foundation, and place the wall panels that need to be installed on its foundation.

4. Sizing, apply polymer mortar to one tenon edge of the two boards together with cement.

5. Installation, move the slat to be installed to the assembly position, correct the wallboard with a crowbar, and pry tightly to make the polymer mortar squeeze out of the joint full.

6. Adjust, with wood into the bottom of the wallboard, so that it is adjusted vertically flat.

Light partition board installation manufacturers

7. Calibration, fixed, with 2 meters or more than 2 meters by the ruler to check the vertical, flat correction.

8. Grouting and grouting, filling the corrected wall with polymer mortar, scraping flat, and filling the upper and lower gaps with polymer mortar.

9. Fixed, the upper part of the wallboard shall be driven into the middle of the wallboard at 45 degrees with Φ6mm or Φ8mm steel bars, and the bottom shall be driven into the concrete foundation with "7" type thread steel at one end and into the wallboard at the other end.

Keyword

Guangdong Jianhong Heavy Industry Technology Co., Ltd. specializes in manufacturing a new generation of environmentally friendly hydraulic piling hammer, with professional products, high quality and high efficiency.

Business License

Contact Us

  • Guangdong Jianhong Heavy Industry Technology Co., Ltd.

    Address: Shishan Zhanchuan Science and Technology Industrial Park, Nanhai District, Foshan City

    Telephone:0757-26173095

             13881835280

WeChat


Copyright: Guangdong Jianhong Heavy Industry Technology Co., Ltd